Why Solid Wall Production Still Gets Delayed (and What Teams Can Do About It)
Event info
Why Solid Wall Production Still Gets Delayed (and What Teams Can Do About It)
A 45-minute session exploring common challenges in solid wall production and how they can be addressed in practice.
Delays in solid wall projects are not always caused by production capacity. In many cases, they can be traced back to earlier stages in the process, where information is missing, coordination takes longer than expected, or production teams do not receive the data they need at the right time.

Even with a finished design, many Solid walls projects run into delays.
Why?
Because the real challenge is not creating the plan—
it’s making sure the plan actually works in production.

Misaligned elements, excessive clutter, and inefficient spacing. The layout does not maximize the available table capacity, reducing overall production efficiency.

Optimized layout: elements are properly aligned, spacing is consistent, and the table capacity is utilized efficiently to maximize production.
In this session, we will look at
- Where delays typically occur in solid wall projects
- Common coordination challenges between design and production
- Ways to improve project flow and reduce bottlenecks
We will also show, in a live session, how IMPACT supports a smoother transition from design to production through a more structured workflow.