Why Sandwich Wall Production Gets Delayed (Even When Planning Looks Right)
A 45‑minute end‑to‑end walkthrough live demo in IMPACT – from finished design to production planning.

Even with a finished design, many sandwich wall projects run into delays.
Why?
Because the real challenge is not creating the plan—
it’s making sure the plan actually works in production
Misaligned elements, excessive clutter, and inefficient spacing. The layout does not maximize the available table capacity, reducing overall production efficiency.
Optimized layout: elements are properly aligned, spacing is consistent, and the table capacity is utilized efficiently to maximize production.
In this recording, you’ll see
- Where production planning breaks down
- Why bottlenecks happen even when everything “looks correct”
- How to create a smoother flow from detailing to production
We will demonstrate live, how production can be planned and adjusted based on real data from the design phase.

